They're done with the framing, electrical, plumbing, and heat/air!! Tomorrow is the four way inspection at 8:30 am. If all goes well and everything passes, insulation will start in the afternoon. I'm getting very excited.
Looks great. It is so exiciting to be moving forwrad on the building. Plus I love the picture of the allthe boys in at the site. Drew sure is handsome!
2 comments:
Looks great. It is so exiciting to be moving forwrad on the building. Plus I love the picture of the allthe boys in at the site. Drew sure is handsome!
Wow the building is coming along. How did the inspection go?
Post a Comment